Fill out the form below or call us directly at 612-708-4913.
Since 1999, ConcreteRenewal has been built on a simple promise: if I sell you the floor, I am the one installing it personally.
I bring 27 years of owner-operator experience to every Dellwood project. In a community that demands uncompromising quality, I refuse to delegate your investment to a rotating crew of hourly employees. Working alongside my son-in-law, Nick, we personally handle every square inch of your installation. This "owner-on-site" model ensures a level of technical precision and moisture mitigation that high-volume franchises simply cannot replicate.

In Dellwood, your garage floor isn't just a utility space—it's the entryway to your home and a barrier against the lakefront environment. Whether you are protecting a custom multi-stall showroom near the White Bear Yacht Club or a luxury estate off Peninsula Road, a standard "one-day" plastic flake floor is a technical mismatch for your investment.
Dellwood’s proximity to White Bear Lake means moisture is constantly pushing up through your concrete slab. Many contractors use thin polyurea primers that cure too fast to achieve a deep bond. When moisture pushes up, these floors bubble and peel. Our Poly-Quartz™ system is engineered for moisture mitigation:
To maximize profit, most contractors race to finish in 24 hours. They use materials that cure too fast to achieve a permanent chemical bond. We refuse to take those shortcuts.
The primary cause of coating failure is "Bond Breakers"—microscopic dust and moisture trapped in the pores. Our proprietary DeCe™ Technology uses sonic velocity air jets to blast trapped particles out of the slab before HEPA-vacuuming. This ensures our resin bonds to the stone, not the dust—a level of prep "speed-installers" simply ignore.


Humidity and tracked-in snow turn standard floors into dangerous "skating rinks" instantly. We solve the "Slip Trap":
I don't have the overhead of national franchises or expensive sales commissions. This efficiency allows me to price our industrial-grade Poly-Quartz™ systems similarly to the thin "one-day" flake floors sold by others. You receive a measurably stronger, moisture-resistant floor for the same investment.
Want a floor built for decades, not just a day? Call me directly at 612-708-4913 for an honest, owner-led assessment of your Dellwood project.
Serving Dellwood Estates, Peninsula Road, and White Bear Lake Shoreline (55110)
At ConcreteRenewal, we understand that Dellwood homes face unique environmental challenges. Whether your garage is located near the Dellwood Country Club, tucked along the shoreline of White Bear Lake, or an established estate on Apple Orchard Road, your slab requires a salt-proof, moisture-resistant solution. Standard "one-day" floors often peel here because they cannot handle the high vapor drive from the lake ecosystem or the thermal movement of massive custom slabs. That’s why we utilize our DeCe™ Technology to dislodge deep-seated silt and moisture before applying our industrial-grade Poly-Quartz system. Greg and Nick personally handle every installation to ensure your floor remains durable, slip-resistant, and visually stunning for decades.
Ready for a local Dellwood estimate? Call Greg directly at 612-708-4913.
We provide owner-installed coatings to luxury properties throughout the area, with a heavy focus on Dellwood's distinct neighborhoods:
Dellwood properties often face high "vapor drive" due to the lake's water table. While fast-curing "one-day" floors can bubble and peel, our Poly-Quartz system uses industrial LABPOX 30 epoxy that penetrates deep into concrete pores to resist hydrostatic pressure and prevent delamination.
Yes. Standard flake floors can be dangerously slick, but our Poly-Quartz system maintains a superior Wet DCOF of 0.75 – 0.85. This exceeds safety standards, providing high-traction safety for lakefront homes even with melting snow and ice.
Absolutely. We utilize a proprietary climate-control trailer to regulate air and surface temperatures. This ensures a perfect chemical bond 365 days a year, regardless of the winter weather in the East Metro.